By January 1, 2034, at least 5 superconducting lines to be active parts of one of the major American electric grids.
Created by JoshuaZ on 2015-08-27; known on 2034-01-01
- JoshuaZ estimated 65% on 2015-08-27
- JoshuaZ said “Note on wording: not all need to be in the same grid but just one of the big three. Also lines between major grids also count. ” on 2015-08-27
- JoshuaZ said “For purposes, the major grids are East, West and Texas. In event of grid fracturing, any grid that is at least 20% of the total electricity consumption will count as a major grid. ” on 2015-08-27
- JoshuaZ estimated 75% on 2015-09-12
- JoshuaZ estimated 72% and said “Reducing confidence based on issues with Tres Amguas http://www.greentechmedia.com/articles/read/tres-amigas-loses-key-interconnect-for-grid-connecting-project ” on 2015-11-18
- JoshuaZ said “*Tres Amigas” on 2015-11-18